Your Growth Plan Depends on Deliverable Power.
Compute capacity depends on the systems beneath it. Power delivery, cooling, connectivity, and commissioning determine when a workload can run, and whether the facility can support its growth.

Power Sets the Pace
Start with available electrical capacity, the work required to deliver it, and the options for supporting future demand.

Density Shapes the Design
Rack loads, heat removal, power distribution, and operating requirements need to be assessed together.

Control Matters
Regional facilities can bring compute closer to users while giving enterprises a clearer view of capacity, resilience, and operating costs.
Start with what already exists.
XYK focuses on finding existing enterprise infrastructure in regional markets, evaluating its power and connectivity, and planning upgrades for higher-density compute.
Each asset requires its own diligence and engineering. The aim is a repeatable operating platform that can bring the right capacity closer to the enterprises that need it.
OUR POINT OF VIEW
Build the Power Plan Into the Compute Plan.
XYK has developed a model that considers enterprise demand alongside utility capacity, the useful life of existing infrastructure, and the communities where facilities will operate. Energy is part of the infrastructure decision from the beginning.

A Solid Foundation in Des Moines.
XYK is negotiating the acquisition of an existing enterprise data center in downtown Des Moines. DSM is the first intended application of the developed model, bringing asset evaluation, modernization, and deployment planning into one execution path.
Acquisition and site plans are subject to closing, due diligence, engineering, and other approvals.